BUZZARD PROJECT

OFFSJORE 2 OFFSHORE 3 OFFSHORE 1

Client: DRAGADOS (ENCANA)

Project: Manufacturing of a tubular structure, supported by reinforced welded shells.

Total Weight: 1,250 tonnes.

Material: P-460

Active participation in the production of a tubular platform structure in the North Sea and the mast for the crane. Pipes with a diameter of 1200 mm and are between 30 and 75 mm thick with base materials P-460. Their lengths vary between 3 and 16 meters.